| Adams Plumbing & Heating, Inc » Projects » Educational | | | |  | | Easthampton High School | | CURRENT PROJECT Easthampton, MA. Easthampton High School includes classrooms, administrative offices, gymnasium, cafeteria and kitchen. The Project was designed in accordance with ...more |
|
|  |  | | Hoosac Valley Middle/High School | | LEED CERTIFIED CURRENT PROJECT Cheshire, MA. Hoosac Valley Middle/High School includes the complete renovation of the existing building along with three new additions. The Project is designed to meet ...more |
|
|  |  | | Longmeadow Middle/High Schools | | CURRENT PROJECT Longmeadow, MA. The project involves the construction of new facilites which include state-of-the-art heating/cooling infrastruction which will result in improved air quality ...more |
|
|  | | MCLA Center for Science and Innovation | | CURRENT PROJECT North Adams, MA. New construction of a three story building will include Teaching and Research Laboratories, Greenhouse and Vivarium, Classrooms, Support Spaces and Lecture ...more |
|
|  | |  |  | | Southbridge Middle/High School | | CURRENT PROJECT Southbridge, MA. The building has three stories and includes sustainable features which include high efficiency boilers which will result in superior energy performance. ...more |
|
|  |  | | UMASS Amherst North Residence Halls | | Amherst, MA. UMASS Amherst North Residential Halls was a project which included four buildings with five floors each set up to provide on campus housing with 864 beds total. ...more |
|
|  |  | | UMASS Amherst Recreation Center | | Amherst, MA. UMASS Amherst Recreation Center was a project which was designed to be energy efficient and meet high sustainability standards. The three-level 120,000 square ...more |
|
|  |  | | Williams College Paresky Student Center | | LEED CERTIFIED Williamstown, MA. Construction of a new sustainably-designed student center, the Williams College Paresky Student Center project was LEED certified. The project included ...more |
|
|  | | Williamstown Youth Center | | CURRENT PROJECT Williamstown, MA. The Project consists of the construction of a single story building which includes Electric air-to-air heat pumps for heating and cooling with roof mounted ...more |
|
|  | |
|
|
|